The transition period - when does what happen?
The transition period - when does what happen?
4 articles
What is the transition period?
The recast Drinking Water Directive (DWD) 2020/2184 introduces, for the first time, a fully harmonised EU-wide system for approving materials and products in contact with drink...
I have a national approval, do I need to be ready in 2026?
The short answer: no — but you do need to be ready after the transition period starts. You have some time, but you need to start preparing. If your product already has a valid...
I want to introduce a new substance/starting material - is there a transition window for me?
If you want to introduce a new starting substance, constituent, etc. into use in the EU (i.e., in a national list) for use in drinking-water-contact products, the transition pe...
Spare parts - the expected impact
One of the less-discussed questions in the Drinking Water Directive (DWD) transition period is what happens to spare parts for products already in service. It will be up to th...